STREET CLOSURES AND CONSTRUCTION ZONES

The streets below will be closed or impacted due to either an event or construction for the dates listed.  Please note that construction schedules are tentative and may change based on weather and other circumstances.

A permit is required to close an alley or a street or to impact parking. For information on Street Closure Permits relating to events, click here.  For information on permits for construction related Street Closure Permits, click here.

South Vine Street
The South Vine Street project widened the existing two traffic lanes, added two new bike lanes, and installed new curbs and gutters. The project engineer was Cannon Associates; contractor was Rockwood General Contractors. Construction began March 2009; work is complete. The project was funded with a grant from Caltrans and from the San Luis Obispo Council of Governments (SLOCOG).

Construction Projects on North and South River Roads 

Construction on River Road from the north to south City limits involves installation of four sets of pipelines by two contractors under contract to two public agencies. The City is upgrading an existing sewerline on North and South River Roads, an upgrade that was identified as being needed since the late 1970s. The City is also removing and replacing an old 8-inch diameter asbestos cement water pipeline and installing conduits for future AT&T use. The County of San Luis Obispo is installing the pipelines for the Nacimiento Water Project. Once all of the pipelines are installed, the City’s contractor will repave South River Road from Navajo to Creston, and North River Road. (The City’s contractor is MGE Underground, Inc.; the County's contractor is Teichert Construction.)

South River Road
On October 21-23, the City will work along the westerly shoulder from Creston to Navajo. The road will be closed during the day to perform this work, but will be open at night.

North River Road
This portion of River Road is open to traffic.  The City's contractor has completed all work and this road is now open. Thank you for your patience.

North River Road south of the Highway 46 overpass to Union Road
The County of San Luis Obispo may still be doing construction work that may require road closures. Please contact County Public Works for more information:  Scott Duffield at (805) 788-2316. Or contact Jacobs Engineering:  Anni Larkins (805) 434-0622. Additional information and updates can be found at the Nacimiento Water Project public information Web site.

Should you require assistance during construction or have any questions, please call the City of Paso Robles Public Works Department at (805) 237-3861.
 


HOT TOPICS

Traffic Calming Program

Adopted General Plan

Local Hazard Mitigation Plan

User Fee Schedules

Major Projects List

Inspection Requests

Engineering
Building
Landscaping
Site
Water

You are here:   Home  »  Government  »   Departments  »  Community Development  »  Engineering Division  »  Street Closures/Traffic Impact Areas