FORMS FOR NEW COMMERCIAL/INDUSTRIAL CONSTRUCTION
You can either download the entire packet in pdf format, which contains everything necessary to apply for the permit, or, if you are already familiar with all the requirements and the process, you can download individual applications as needed.
Download Entire Application Packet
Information
Submittal Requirements
Excavation & Grading Information
Time Frame for Plan Review Process
San Luis Obispo County Assessor Requirement
Water Meter Options
Installation requirementsapproved RP devices
Penalties for Work Without Required Permits
Time Frame for Engineering Plan Check
Applications
Commercial Wastewater Discharge Permits
Concurrent Review Form
Consent of Landowner
Form
Engineering Permit Application
(Grading/Site Plan Permit)
Information Pertaining to Building Permit
Hazardous Material Questionnaire Verification
Owner-Builder Verification
The Paso Robles Municipal Code, 17.04.030 (C) requires the installation of automatic sprinkler system for many commercial structures. For more on requirements for fire sprinklers, check out the Developer's Corner in the Emergency Services Department.