ABOUT THE DEPARTMENT
The Community Development Department consists of the Planning, Engineering and Building Divisions, involving the Department in all aspects of development. From the grading of the lot to the construction of the building (pad, structure, electrical, plumbing), and installation of final improvements such as landscaping and signage.
For example, the process of building a new home may start with a developer submitting plans for a single-family residence or an entire tract to the Planning Division. There it is reviewed for consistency with the Municipal and Zoning Codes and the General Plan. The Engineering Division checks plans to verify they will properly connect to the City infrastructure (water, sewer) and ensure grading is properly done and required improvements (such as sidewalk, curb and gutter) are installed. The Building Division reviews the plans and inspects dwellings as they are built to ensure safe habitation under the Building Code.
The process is similar for Commercial development; wherein it begins with the Planning Division, is checked by Engineering, and finally issued permits by the Building Division if all necessary criteria and fees are met.
The City’s Community Development Director oversees the following Divisions:
Planning Division facilitates the land use
planning and development process, assisting the City Council, Planning Commission and the Development
Review Committee in establishing and carrying out land use policies and plans. The Citys General Plan is the document
that contains the Citys
land use policy, and the Citys specific plans and Zoning Code are implementation
tools. All land use related applications and entitlements (use permits, i.e.
Conditional) are processed through the Planning Division.
Download the Development
Process Flowchart.
Building Division interprets the Building Code by
overseeing the plan check and inspection process for all construction requiring a
Building Permit. The Building Official and a team of construction management
specialists also oversee major City capital projects including those buildings
authorized for funding by the voter approved Measure D of 1998.
Engineering Division interprets the Engineering
Standards, Sewer and Water Atlass. The Engineering Division is responsible for
insuring that private developments are designed in a manner consistent with City and
other applicable codes and standards. The Engineering Division deals with development
on private property and connections to City infrastructure.
Housing Programs provides services related to low
and moderate income housing, Community Development Block Grant (CDBG) funded
projects, and use of the Redevelopment Agencys Housing Set Aside funds.

